“We are usually serving our customers with our greatest goods.” The group has taken element in the generating and revising of ISO/TC100 worldwide chain normal numerous a long time in success and hosted the 16th ISO/TC100 Global once-a-year meeting in 2004. The high precise CNC gear, this kind of as Slow-feeding wire-cut machine, jig grinding equipment and electric powered discharge device, guarantees the leading top quality precision of mould processing, with the substantial efficient and environmental security acid rolling line becoming the premier raw content changing products in the subject in china The wildly use of automatic milling machine, large-velocity automatic feeding punch, large speed computerized rolling and assembling machine guarantees the high top quality and performance of elements and chain making. SD16 Crawler Bulldozer SHXiHu (West EPT) Dis.HU (WEST LAKE) DIS.I
Motor EPTT: 120Kw STYRE WD615T1-3A motor
Fat: 17000 Kg
StraigEPTT blade: 4.5M3
ShXiHu (West EPT) Dis.Hu (West EPT) Dis.i ( EPT ) SD16 bulldozer can equip with single ripper or three teeth ripper, straigEPTT blade or angle blades to do all types of engineering operates.
As one particular of the oldest bulldozer manufacturing unit with EPT approach, we can provide best top quality bulldozers to you.
I. Engine
Brand: Steyr(WEICEPTI)
Model: WD615T1-3A EURIII
Sort: Water cooled, in line, 4-stroke EPT
Rated revolution: 1850rpm
Rated EPTT: 120KW–160HP
CylinEPTTnumber-bore X stroke: 6-126 X 130
Piston displacement: 9.726L
Rnted fuel usage: 188g/kw. H
Max. Torque: 764N. M
EPT 1st 2ND third
EPTT (km) -3.29 -5.28 -9.sixty three
Reverse (km) -4.28 -7.fifty nine -12.53
Dozer Straight-tilt
Min. Floor clearance(mm) four hundred
Bodyweight(kg) 17000
Ground stress(MP) .067
Min. Turning radius(m) 4.seven
Gradeability ( deg ) thirty
Monitor gauge(mm) 1880
Dozing capability(m3) four.5
Blade width(mm) 3388
Blade height(mm) 1149
Max. Fall under floor (mm) 530
Max. Tilt adjustment(mm) 400
II. EPTT TRANEPTITTING System
Torque converter: Torque converter, three-element, one-stage, 1-stage
EPTT: Planetary EPT variety EPTT-shaft pressured lubrication
Primary EPT: Spiral EPTTl EPT, One-phase velocity reduction, Splash lubrication
Steering EPTT: Wet. Multi-disc, EPT loaded, hand EPT aiding procedure, EPT separating, linking steering brake.
Steering brake: Damp, Floating Foot stepping brake with EPT assisting
Closing EPT: two-phase pace reduction of spur EPT splash lubrication.
III. UNEPTTCARRING Method
Kind: Sprayed beam, suspended composition of equalizer
Carrier rollers(every side): Two
Observe rollers(each and every side): Six
Observe variety: Assembled single tooth
Width of keep track of shoes: 510mm
Pitch: 203.2mm
IV. HYEPTTLIC Technique
Max. Preesure: 14MPa
EPT sort: EPT pump
Discharge: 243L/min
one hundred sixty HP SD16 EPTnical requirements: |
Blade Kind | Straight-tilt | Angle | U-Blade |
Min. ground clearance: | 400 mm | four hundred mm | 400 mm | |
Ground strain: | .072 MPa | .074 MPa | .074 MPa | |
Min. turning radius: | four.466 m | four.513 m | four.545 m | |
Gradeability: | thirty deg | thirty deg | thirty deg | |
Track gauge: | 1880 mm | 1880 mm | 1880 mm | |
Engine | Product amp sort | EPTgchai SC11CB184G2B1/EPT WD10G178E25 h2o-cooled, in-line, 4-stroke EPT immediate |
||
Rated EPTT | one hundred twenty kW | |||
Number of cylinders | 6-126 x one hundred thirty mm (bore x stroke) | |||
Piston displacement | 9.726 L | |||
Min. gas use | 214 g/kW middoth | |||
MaXiHu (West EPT) Dis.mum torque | 765 N middotm@1300 rpm | |||
EPTT EPTT Program |
Torque converter | 3-element, one stage, 1 stage | ||
EPTT | Planetary EPT variety, EPTT-shift, compelled lubrication | |||
Main EPT | Spiral EPTTl EPT, solitary phase speed reduction, splash lubrication |
|||
Steering clutch | Lubricated, multidisc, EPT loaded, hand EPTally divided, inter-linking with steering brake |
|||
Steering brake | Lubricated, floating EPT construction, foot brake with EPT booster |
|||
Last EPT | two-phase pace reduction of spur EPT, splash lubrication |
|||
Vacation Speed |
EPT | 1st | 2nd | third |
EPTT | ~3.29 km/h | ~five.82 km/h | ~nine.sixty three km/h | |
Reverse | ~four.28 km/h | ~7.fifty nine km/h | ~12.53 km/h | |
UNEPTTCARRIAGE Program |
Kind | Sprayed beam, suspended composition of equalizer | ||
Carrier rollers | 2 each aspect | |||
Monitor rollers | six each aspect | |||
Monitor sort | Assembled, single-grouser | |||
Width of observe sneakers | 510 mm | |||
Pitch | 203.2 mm | |||
HYEPTTLIC Program |
MaXiHu (West EPT) Dis.mum force | fourteen MPa | ||
EPT variety | EPT pump | |||
Discharge | 243 L/min | |||
Bore of doing work cylinder instances no. | one hundred ten mm moments two | |||
BLADE | Blade type | Straight-tilt | Angle | U-blade |
Dozing potential | four.5 m3 | four.three m3 | 5. m3 | |
Performance (Theoretical value 40 m) |
225 m3/h | 225 m3/h | 250 m3/h | |
Blade width | 3388 mm | 3970 mm | 3556 mm | |
Blade peak | 1149 mm | 1040 mm | 1120 mm | |
MaXiHu (West EPT) Dis.mum fall below floor | 540 mm | 540 mm | 530 mm | |
MaXiHu (West EPT) Dis.mum tilt adjustment | four hundred mm | – | four hundred mm | |
RIPPER (OPTIONAL) |
MaXiHu (West EPT) Dis.mum digging depth of three-shank ripper |
572 mm | ||
Fat of 3-shank ripper | 1667 kg | |||
MaXiHu (West EPT) Dis.mum elevate earlier mentioned floor | 592 mm |