Factory High Qualtiy direct stainless steel materials spur gear shaft

Factory  High Qualtiy direct stainless steel materials  spur gear shaft

In 2008, it was awarded with “Nationwide Export Commodity Inspection-free of charge Company”.

Overview

Swift Specifics

Relevant Industries:

Resorts, Garment Stores, Building Content Retailers, Production Plant, Equipment Mend Stores, Foods & Beverage Factory, Farms, Cafe, Property Use, Retail, Foods Store, Printing Retailers, Design works , Vitality & Mining, Foodstuff & Beverage Shops, Marketing Firm

Content:

Stainless Steel

Standard:

ISO

Spot of Origin:Zhejiang, China
Brand Identify:

OEM

Merchandise title:

Manufacturing facility immediate stainless metal materials spur gear shaft

Shade:

Nature

Certification:

ISO9001

OEM:

Help

Delivery Time:

30-45Days

Normal or Nonstandard:

Nonstandard

Source Capacity

Provide Ability:
10000000 Device/Models for every Month

Packaging & Shipping

Packaging Particulars
plastic bag+plywood box+in accordance to customers’ needs
Port
HangZhou Or Ningbo
Picture Illustration:

Direct Time
:
Amount(Models) 1 – a thousand >1000
Est. Time(times) 45 To be negotiated

On the web Customization

Movie Description

 

 

1 Substance

 

C45(1.0503),SS304(one.4517),SS316(one.4541),Q235(S235JR),Q345,C20,40Cr,POM,PA6,Aluminum,GG25, Qt900-two,qt600-3,qt800-two,qt500-seven,9cr18mov,qt400-15,20CRMNTI,42CRMO,Brass(Copper)

—SPROCKETS/GEARS/CNC MACHINING Elements/BUSHINGS/SHAFTS/PULLEYS/COUPLINGS
40Cr,40MN,45MN,65Mn,SS304(1.4517),Rubber—Chains

 

two Custom-made

Drawing as normal or accredited by shopper before generation

3 Regular

ANSI ,ASA,DIN ,JIS ,BS, ( SATI, CHIARAVALLI, BEA,MARTIN, BROWNING,KANA)

4 Heat Treatment

Harden tooth, Carburizing and Quenching,Gas Nitriding

five Suface Remedy

 

Black Oxide, Black phosphating, Nickel plating,Chromium plating,Copper Passivation

6

 

Process

 

Forging( casting)—lathe- teeth shaping—finishing—oil washing—Packing ,made by CNC device

seven Inspection

 

All things are checked and analyzed thoroughly in the course of every single doing work treatment and after the solution is finally made to make sure that the greatest high quality solution enter into the market.

 

eight Purpose

Tough, poor problem Resistance

9 Shipping Time In inventory or about thirty-50 Times days